Centrum Pali, a leading manufacturer of prefabricated reinforced concrete piles, faced this challenge and decided to take steps to significantly improve efficiency. The implementation of the CargoON platform, along with the Dock Scheduler module, proved to be a true game-changer, the details of which we present in our latest case study.
The Weight of the Challenge – Literally and Figuratively
As part of the international Per Aarsleff Holding A/S group, Centrum Pali manages large-scale transport operations daily. Each truck carrying foundation piles transports loads up to 57 linear meters in length and weighing up to 24 tons. On average, 60 fully loaded trucks depart from the company’s warehouses daily, putting enormous pressure on the entire logistics infrastructure.